Geometric Model Fig.1: Pipeline installation from upstream 16″/12″ reducer to front of flowmeter. Flow direction and coordinate system. Fig.2: Detail of 16″/12″ reducer with CFD grid. May 5, 2001 Dr. A. Filippone
Fig.1: Pipeline installation from upstream 16″/12″ reducer to front of flowmeter. Flow direction and coordinate system.
Fig.2: Detail of 16″/12″ reducer with CFD grid.